Eskom has issued a tender for the provision of milling plant reject removal for a period of 60 months at Camden Power Station.

Deadline: 23 May 2025

There will be a virtual non-compulsory briefing meeting on Wednesday, 23 April.

Camden Power Station (CPS) is a fossil fuel-fired power station which consists of eight generating units, each capable of producing 200MWe. The boilers are front-fired with a steam drum.

The boiler has five dedicated coal milling (grinding or pulverising) units, each with a capability of 50MWe.

During normal MCR operation, only four mills are in service, and one is always on standby/maintenance.

The objective of this contract is to provide coal reject removal service for the milling plant at Camden power station.

The mills are required to be retained in an excellent working condition to ensure complete combustion, optimum efficiency and/or to avoid partial load loss.

The milling plant is a critical plant at Camden Power Station, making the milling plant service and maintenance also critical, as any failure may result in a 50MWe partial load loss.

View
More tenders

The mills reject poor-quality coal, stones and foreign material to the reject box, and this waste must be removed timely during the operation of the mill to ensure optimum performance.

Mills are required during unit light-ups, shutdowns, normal operation and load changes.

Availability, reliability and performance of the milling plant are essential in terms of ensuring optimum performance of the plant and hence the need for a service contract.

Follow our WhatsApp channel for exclusive daily content, breaking energy and water news, tenders, insights from industry experts and more

The objective of this contract is to provide coal reject removal services for the milling plant at Camden power station.

The Employer and the Contractor shall be committed to the following:

  • The coal rejects are removed every hour from both reject boxes of the mill. Action 24 Mill fire prevention and operation during a mill fire (240-168911966)
  • The coal rejects removed from the mill reject boxes are dumped at an appropriate dumping site, and the area in front of the reject doors is left clean.
  • The amount of rejects removed from each of the two reject boxes per mill is recorded based on the number of wheelbarrows.
  • Identification and defecting of inner and outer reject doors.
  • No dumping on the floor.

Daily inspections are to be done on mill reject doors for leaks, and check sheets are to be submitted to boiler maintenance daily. The defects found on the reject doors are to be defected.

Tender documents can be obtained from the Eskom website.

Tender box address

Camden Power Station
Piet Retief Road
NUCAM
2351

Subscribe to the newsletter for free and join over 50,000 readers using ESI Africa as their news source for marketing development on all things related to power and energy.

Source: https://www.esi-africa.com/tenders/eskom-issues-a-milling-tender-for-camden-power-station/

.

Share